Highlights | Neighborhood Cafe (April 15, 2025)

Highlights | Neighborhood Cafe (April 15, 2025)

Couldn’t make it to the virtual Café last month? We’ve got you covered. From pollinator partnerships and park plans to infrastructure updates and landscaping progress, here’s a snapshot of what’s happening across Baseline — and what’s ahead.

Butterfly Pavilion 

Reason for not moving to Baseline: Butterfly Pavilion is stabilizing after staffing changes and economy shifts.

McWhinney is still fully committed to Baseline’s vision of the pollinator district. 

Butterfly Pavilion is still a pivotal partner, through Design Review Committee, annual pollinator surveys, pollinator education and community engagement. 

Buzz 

Revisiting plan and exploring new location possibilities – beer garden, dog park, community gardens still part of plan. 

May move STEM school to former Butterfly Pavilion site, and Buzz to STEM site to make location financially viable for food and beverage provider .

Center Street

Plans submitted to city for approval; multiple rounds of review anticipated .

Jan. 20, 2026 – Anticipated City Council Meeting for final approval of phase 1 vertical plans 

Rally Park

  • Intended to be a regional park.  
  • Location: Linear Park Phase 3. See map.
  • Public restroom & reservable shelter
  • Sports courts: Pickleball, Basketball Court
  • Scooter Park
  • “The Glade” – picnic area
  • Construction anticipated to starts Jan 2026  
Playground features
  • Traditional playground items, swings, slides, etc
  • Climbing wall with discovery areas
  • Areas for young children and 5-12 year olds

Infrastructure 

West Village

City and County of Broomfield actively walking streets for final acceptance, location for repairs are being marked 

All streets will require seal coat and restriping before final acceptance is complete, dates to be shared in future newsletter(s).  

Alley repairs happening in 2025, select locations starting week of May 5, watch for details in newsletter. 

Center Street

Going through City approval process;  horizontal construction anticipated to commence Q1 of  2026 .

160th & Sheridan 

Concrete ~90% of paving complete, delays due to utility conflicts 

Paving resumes after May 22, per request of the city (due to Prospect Ridge traffic) 

Full 7-day closure of intersection in May to finish intersection roadwork (watch for newsletter for details) 

Post-closure – work on median improvements (6 weeks) 

Landscape median August to October 2025 

167th Ave. 

Asphalt repair targeted for August 2025 

Traffic Signal – 167th & Sheridan

Expected to be set and operational by July 2025.

Parkside West, Phase 3

Roads complete in October 

Homes start by year end

Southlands

Road paving – projected July 2025 

Homes start in September 

Landscaping – West Village 

Native Grasses
  • Pollinator district
    100% continuing 
  • Regulatory changes 
    Senate Bill 5 limits the use of turf, including bluegrass and fescue, from “non-functional” areas
  • Highlights from Sod vs Native Grass blog
      • Warm season grasses won’t germinate until late May
      • Foot traffic slows/prevents growth. Avoid walking in native areas.
  • Highlights from Native Grass FAQs
Spring 2025 Landscape |
New Installation Schedule
    • Sheridan Parkway East Side Landscape – Started 3/31/25 
    • Peak Street and 167th Ave Sidewalks and Tree lawns – Started 4/7/25 
    • Quad Landscape and Irrigation Repairs – Started 4/7/25 
    • Alcott Sidewalk and Landscape Restoration by Xcel – Started 4/14/25 
    • 166th Lane Drainage Swale Seeding and Landscape – Starting 4/21/25 
    • Park Lane Shade Structure Roof Cladding – Starting 4/21/25 
West Village, Phase 1  |
Far South buffer and Triangle park in KB Homes area
    • 2023 | Seeding complete as planned, met expectations.
    • 2024 | Maintenance issues and builder damage, some native areas regressed.
    • 2025 | New landscape vendor, Environmental Designs, Inc., aerating, reseeding and composting all native areas, scheduled for the week of April 18 – 25 (ideal timing). For additional maintenance, see landscape work schedule for 2025
West Village, Phase 2 |
Late 2023 – early 2024  
  • Incorrect seed mix applied (label correct, contents were not; all seed used on the project goes through a field review check)  
  • Additive seed was in mix, Perennial Rye mix grass overtook native grass.  
  • Grasses removed and reseeded with correct mix in late 2024. 
  • Early 2025- Reseeding will occur, and sparsely covered areas will be treated as they are noted
  • Homebuilder construction completed Jan. 2025, so native grasses in these areas can now be seeded
  • Builder agreed to repair irrigation damage and grading issues, work tentatively set for first week of May
  • New landscape vendor, Environmental Designs, Inc., aerating, reseeding and composting all native areas, scheduled for the week of April 18 – 25 (ideal timing).

Community Clean Up 

  • New landscape crew providing weekly litter pick up in West Village 
  • Spot cleanups will occur after major wind events. 
  • Resident-involved Community Clean Up happening April 26. 
Scroll to Top